Olympic Reservoir Replacement
This project consisted of a cast-in-place, two-cell concrete reservoir to replace the existing reservoir. A valve kiosk was also installed under this contract 1 km away from the reservoir with twin HDPE watermains connecting the two locations. Several tie-ins to the existing system were required to complete this project.