Lumby Lift Station Upgrades
The scope of this project consisted of the supply and installation of a pre-packaged lift station, odour control unit and an emergency standby generator. This contract also included the design-build of a Service and Washroom Building. Construction also included the installation of approximately 150m of new Sewage Forcemain and Sanitary Sewer Lines complete with connection to the existing services. Perimeter well-point dewatering and a slide rail shoring system were both used to install the lift station