First and Boundary Pump Station Upgrades
The scope of this project consisted of demolition of the exiting pump station, installation of a new 1500mm manhole and rehabilitating the existing wet and dry wells converting the dry well into a second wet well. Under this contract was a new control building and installation of all electrical equipment. A new underground valve chamber was installed including all mechanical & civil piping, fittings and appurtenances. Construction took place on a very small lot at a very busy intersection with very little disruption and no damage to neighbouring business that were in a very close proximity.