Craigflower Pump Station
This project consists of the construction of a new 14.0m x 22.0m wastewater pump station facility. As a mechanical subcontractor, Carver supplied and installed 4-250hp pumps complete with the associated piping, valves, gates and miscellaneous accessories. Also installed was an elaborate odour control system for the facility.